0640
0384
0128
DATUM · DRAWING A-101 · SCALE 1:200 · REV C
FOR CONSTRUCTION

DATUM

SURVEYING & SITE PLANNING
PLS #4471 · OREGON · WASHINGTON · IDAHO

WE MEASURE
WHAT YOU
BUILD ON

Datum turns raw ground into a drawing your engineer, your lender and your county planner will all accept the first time. Field crews out within five business days; sealed deliverables in ten.

1 240 PARCELS MAPPED SINCE 2009
SE ALDER ST — 60' R.O.W. 142 140 138 PROPOSED STRUCTURE 18 304 SF BM-01 EL 142.62 STA 3+18 · IRON PIN 104.60 m 78.25 m N
FIG. 1 — PARCEL 04-22-19-B, CLACKAMAS CO. NAD83 / OR NORTH
SHEET INDEX — WHAT WE DELIVER
04 DISCIPLINES · SEALED & FILED
01

BOUNDARY
SURVEYS

Deed research, monument recovery and a stamped plat your title company can record.

ALTA / NSPS · 10 DAYS
02

TOPOGRAPHIC
MAPPING

0.15 m contours, spot shots and located utilities on one coordinated sheet.

DWG · PDF · CSV
03

UAV & LIDAR
CAPTURE

Point clouds at 400 pts/m², georeferenced and handed over as LAS or IFC.

PART 107 · 2 DAYS
04

CONSTRUCTION
STAKING

Offsets, cut sheets and as-builts kept current from mobilisation to closeout.

CREWS ON CALL · 6AM
4 × 314 = 1256 mm